Search  

Schluter®-TROBA

Installation

  1. The load-bearing substrate and waterproofing membrane must be flat and adequately sloped toward, and connected to, the designated drainage exit.
  2. Irrespective of slope, Schluter-TROBA is loosely laid over the waterproofing membrane. Individual courses of Schluter-TROBA are overlapped along the flat edges while the ends of two courses are overlapped by at least one row of studs.
  3. The surface covering assembly is installed directly over the Schluter-TROBA according to current industry standards. If tile is to be installed using the Schluter-DITRA system, please refer to the Schluter-DITRA Installation Handbook for complete installation instructions and warranty criteria.